Part 4, Heater wiring, Part 4 – heater wiring – HTP EVC115 User Manual
Page 15
15
LP-379 REV. 3.25.14
Figure 7
– Piping Detail for EVC080 and EVC115 Models - NOTE: Drawing is meant only to demonstrate system piping
concept. The installer is responsible for all equipment and detailing required by local codes.
PART 4 – HEATER WIRING
Tank must be full of water before power is turned on. Heating elements will be damaged if energized for even a short time while tank is
dry. Failures due to “dry-firing” are NOT covered by warranty.
This unit is factory wired to a junction box on top of the water heater for field wiring connection. These heaters are equipped and wired
for the maximum possible input allowable (see Table 2 for listing of inputs and amperage requirements). The voltage requirement and
dedicated wattage load for the heater is specified by the separate element kit, purchased separately and not included with this water
heater. Consult your local power company to determine if your electrical service is adequate for the additional load of the heater.