beautypg.com

St55gf-manual-11.pdf, Agency requirements – SilverStone ST55GF Manual User Manual

Page 12

background image

6. Agency Requirements

6.1 Safety Certification.

6.2 Input Leakage Current

Input leakage current from line to ground will be less than 3.5mA rms. Measurement will be
made at 240 VAC and 60Hz.

6.3 Production Line Testing

100% of the power supply production must have the following test performed. Each power
shall be marked indicating the testing was done and passed. Typically this is done by
stamping or labeling the power supply with "Hi-pot test OK".

6.4 Hi-Pot Testing

Each power supply must be Hi-pot tested according UL and TUV requirements, Minimum
typical testing voltage for Hi-pot testing are 1500Vac or 2121Vdc. However depending on
the power supply design the testing voltage May be higher. If higher the power supplies
shell be at the higher value.

6.5 Ground Continuity Testing

UL and TUV require that each power supply ground is tested, to ensure there is continuity
between the ground inlet of the power supply and the power supply chassis. This can be
performed with an ohm meter, or an electronic circuit that lights up and illustrates the
ground has continuity. Based on EN50116, ERG or TUV require that each power supply
ground id tested with a 25Amp ground test.

Product Safety

RFI Emission

PFC Harmonic

UL 60950-1 2000Edition, IEC60950-1, 3rd Edition

EU Low Voltage Directive (73/23/EEC) (CB)

TÜV

EN55024: 1998 + A1: 2001 and A2: 2003

-IEC 61000-4-2

-IEC 61000-4-3

-IEC 61000-4-4

-IEC 61000-4-5

-IEC 61000-4-6

-IEC 61000-4-11

FCC Part15 ( Radiated & Conducted Emissions )

CISPR 22,3 Edition / EN55022: 1998 + A1: 2000)

EN61000-3-2:2000

Flicker

Immunity against:

-Electrostatic discharge:

-Radiated field strength:

-Fast transients:

-Surge voltage:

-RF Conducted

-Voltage Dips and Interruptions

EN61000-3-3: 1995 + A1: 2002

11

rd