Installation, Inst, Inst installing alling alling alling alling – Ransburg REA III Auto Applicator 70393 User Manual
Page 14
![background image](/manuals/348171/14/background.png)
AA-82-01.3
INST
INST
INST
INST
INSTALLA
ALLA
ALLA
ALLA
ALLATION
TION
TION
TION
TION
INST
INST
INST
INST
INSTALLING
ALLING
ALLING
ALLING
ALLING
1. To connect the high voltage cable, remove the
cable retainer bracket and remove the protective
cap for the power supply high voltage cable
socket. Insert the high voltage cable (and plug)
into socket. Gently hand-tighten the cable
retaining nut. Reattach the bracket.
2. The control unit MA
MA
MA
MA
MAY
Y
Y
Y
Y be connected through
conduit with an explosion-proof terminal on or near
the spray booth where it will be convenient, or
may be connected with a line cord depending upon
application requirement.
1
1
1
1
11
1
1
1
1
REA III 100kV Automatic Applicator - Installation
>
Refer to the Power Supply Service
Manual for the circuit diagram and in-
structions to connect the power supply.
N O T E
N O T E
N O T E
N O T E
N O T E
3. Install Filters: Install the optional fluid filter on
output of fluid supply. Detail depends on whether
pressure tank, pump unit, recirculating system,
etc. is used. Filter must be installed vertically with
drain valve down and arrow pointing in direction
of flow (see Figure 1).
4. Install Line Hose (Air or Fluid):
>
ITW Ransburg supplies a standard
25 ft. (8m) hose. Optional hose lengths of
36 ft. (11m), 50 ft. (15m), 75 ft. (23m), and
100 ft. (31m) are available. To meet
various length requirements, the hose
fitting on one end has not been attached.
Determine the hose length that is needed
and cut the hose. Attach the other fitting
as follows:
N O T E
N O T E
N O T E
N O T E
N O T E
a. Lubricate all fittings with petroleum jelly.
b. Screw ferrule counter-clockwise onto hose
until it bottoms. Then back it off about 1/8-
inch (3mm).
>
Installation of the equipment MUST
MUST
MUST
MUST
MUST be in
compliance with all Federal, State, Local and
National codes.
>
The power supply MUST
MUST
MUST
MUST
MUST be located
OUTSIDE
OUTSIDE
OUTSIDE
OUTSIDE
OUTSIDE of the spray area.
>
Personnel MUST
MUST
MUST
MUST
MUST be GROUNDED
GROUNDED
GROUNDED
GROUNDED
GROUNDED to
prevent a shock or spark during electrostatic
operation.
>
Install and route the hoses and cables so
they are NOT
NOT
NOT
NOT
NOT exposed to temperatures in
excess of 120
°F (49°C) and so that all hose
and cable bends are NOT
NOT
NOT
NOT
NOT less than a 6-inch
(15 cm) radius. Failure to comply with these
parameters could cause equipment malfunc-
tions that might create HAZARDOUS CON-
HAZARDOUS CON-
HAZARDOUS CON-
HAZARDOUS CON-
HAZARDOUS CON-
DITIONS!
DITIONS!
DITIONS!
DITIONS!
DITIONS!
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
!!!!!
>
The power supply MUST
MUST
MUST
MUST
MUST be located
outside of the spray area. Install units in
accordance with the requirements of local
regulations.
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
!!!!!
>
The union stem will not seat if the hose
is bottomed against the ferrule.
N O T E
N O T E
N O T E
N O T E
N O T E