Installation, Top view, Metal ring – General Tools and Instruments RGR122 User Manual
Page 3
3
GB
P. ANTENNA
- Transmits radio signal to main unit
Q. CROSS
- Checks the leveling of the rain collector
R. BATTERY COMPARTMENT
- Accommodates two UM-3 or AA-sized batteries
INSTALLATION
1. Position the main unit and rain collector within effective
range (300 feet).
2. a) Insert batteries into the rain collector.
b) Mount the rain collector on a level surface
c) Put drops of water on the cross at the base to check the
leveling
d) Use the metal ring to adjust the leveling of the rain collector
4
3
TOP VIEW
!
"
Water stay at
position 1 - 4
means the gauge
is not leveled
"A
A"
U
M
3 1
.5
V
"A
A
"
U
M
3
1.
5
V
METAL RING
See also other documents in the category General Tools and Instruments Tools:
- 119 (1 page)
- 146 (2 pages)
- 1478 (1 page)
- 147 (1 page)
- 80560 (1 page)
- 840 Pro Doweling Kit (36 pages)
- 840 use of Dowel Centers (4 pages)
- 841 (8 pages)
- 849 (2 pages)
- 850 (2 pages)
- 860 v.1 (16 pages)
- 860 v.2 (44 pages)
- 860 Addendum (1 page)
- 870 v.1 (2 pages)
- 870 v.2 (46 pages)
- 880 (2 pages)
- 861 (16 pages)
- AQ150 (16 pages)
- AT60LR (1 page)
- BAR4225 (13 pages)
- BF10 (12 pages)
- CA10 (16 pages)
- CAF4221 (12 pages)
- CAF4224 (14 pages)
- CDM77232 (15 pages)
- CDM77535 (12 pages)
- CGD900 (12 pages)
- CIH20DL (28 pages)
- CL10 (20 pages)
- CMM880 (11 pages)
- CMR35 (36 pages)
- CPH12101 (1 page)
- CT101 (8 pages)
- CT102 (8 pages)
- CT103 (8 pages)
- CT6235B (16 pages)
- DA833 (16 pages)
- DAF2005MDL (27 pages)
- DAF3300 (40 pages)
- DAF3010B (12 pages)
- DAF4207SD (16 pages)
- DAF4223 (13 pages)
- DAF80PWM (10 pages)
- DAF80PW (10 pages)
- DBAR110 (16 pages)