Fairbanks Portable Axle Load Scale User Manual
Page 6

A. Introduction
The standard installation of the Portable Axle Load Scale consists of locating the platform,
leveling the platform, installing the ramps, interfacing the platform to an instrument, and
calibrating/ adjusting the system.
B. Site Selection
The following points should be considered when selecting a location for the platform.
1.
Locate the platform to allow convenient maneuvering of vehicles over the
platform.
2. The location should provide a solid base to support the platform and be level.
3.
The location must be able to support the platform plus the weight that will be
placed upon it.
C. Standard Platform Installation
1.
The platform is shipped fully assembled and wired. Remove the platform from
the packing materials.
2.
Connect lifting straps or chains to the lifting lugs on the sides of the platform.
The lifting straps/chains should be long enough to form a 45-degree angle with
the platform during the lifting process.
3.
Place the platform in the desired location.
4.
The platform should be made stable and level. Shims are not included with the
platform and must be supplied locally as needed.
5.
Remove the four (4) cover plates.
6.
Drill and anchor the platform using the supplied
¾” wedge anchors.
04/05
6
50784 Issue 1
Section 22: Installation
~ Caution ~
Absolutely no arc welding operations are to be performed on or near this scale while the
load cells are in place and/or connected. All load cells must be disconnected and removed
during welding.