Section 2: installation, Overall steps, Tools, equipment, and materials – Fairbanks VSX SERIES TRUCK SCALE User Manual
Page 13

04/12
13
51173 Rev. 8
Section 2: Installation
OVERALL STEPS
A. Foundation check, layout, and base plate setting
B. Preparing tools, materials, documentation and renting a crane.
C. Setting up the modules
D. Setting the modules on load cells.
E. Wiring
F. Calibrating and Testing
Tools, Equipment and Materials
Certified Prints
A mobile crane of sufficient lifting capacity to safely lift and place the main beams
which are approximately 2000 lbs.
Four equal length twenty foot (4-20 ft.) lifting chains or cables with hooks.
IMPORTANT NOTE:
The installer MUST reserve Crane and Chains/Cables in
advance from a local rental service company.
Hand tools.
Hydraulic jacks.
Two fifteen ton (15 ton) hydraulic
jacks.
100' steel tape measure.
String line or chalk line (both)
Pry bars.
MUST reserve a Crane in advance