Prior to installation – Fairbanks Ultegra Junior Bench Scale User Manual
Page 9

07/2013
9
51119 Rev. 4
Section 3: Installation
3.1. Prior to installation
1. Pre-Installation checklist
2. Powering up the scale
3. Computer interface
4. Weighing
3.1.1. Pre-installation checklist
The following points should be checked and discussed with the Area Sales Manager
and/or customer, if necessary, before the technician goes to the site and installs the
equipment.
Check the customer's application to make certain it is within the capabilities and
design parameters of the equipment.
If the installation process might disrupt normal business operations, tell the
customer and ask that they make ample arrangements.
Be sure that the equipment operator(s) are available for training.
The service technician reviews the recommended setup with the
Area Sales Manager or Area Service Manager, and together
they identify all necessary variations to satisfy the customer's
particular application.
3.1.2. Unpacking
Follow these guidelines when unpacking all equipment:
•
Check in all components and accessories according to the customer's order.
•
Remove all components from their packing material, checking against the invoice
that they are accounted for and not damaged.
Advise the shipper immediately, if damage has occurred.
Order any parts necessary to replace those which have been damaged.
Keep the shipping container and packing material for future use.
Check the packing list.
•
Collect all necessary installation manuals for the equipment and
accessories.
•
Open the equipment and perform an inspection, making certain that
all hardware, electrical connections and printed circuit assemblies
are secure.
•
Do not reinstall the cover if the final installation is to be performed
after the pre-installation checkout.