beautypg.com

Load cell replacement – Fairbanks 5000 Series Bench Scale Platforms User Manual

Page 9

background image

07/13

9

51245 Rev. 3

Section 4: Parts Replacement

Load cell replacement

Tools required:

Open-end wrench

Side cutter

Torque wrench

Procedure:

1. Disconnect the instrument from the power supply.

2. Place the platform upright without the cover.

3. Remove the screws holding the load cell and spacer in place.

4. Remove the load cell and cable, and note the cell and cable placement!

5. Install the new load cell and the spacer(s).

6. Tighten the load cell mounting screws to 8 (± 2) INCH/LBS of torque only.

7. Route the load cell cable exactly as the original cable and plug in the connector.

8. Calibrate the instrument.