beautypg.com

Operation – Teledyne OT-2 - Oxygen transmitter system User Manual

Page 19

background image

Model OT-2 System

Operation 3

3-1

Teledyne Analytical Instruments

Operation

Operation of the Model OT-2 System involves installing the unit,

making appropriate sample gas connections, and calibration.

3.1

Installation

WARNING: Safe operation of the system requires the user to

properly ground the system, install the wiring and
power the transmitter.

It is the user's responsibility to determine and in-
stall, should a safety barrier be required.

Installation of the Model OT-2 System includes:

1. Unpacking

2. Mounting

3. Gas connections

4. Electrical connections

5. Installing the Micro-Fuel Cell

6. Testing the system.

3.1.1

Unpacking the Analyzer

Carefully unpack the analyzer and inspect it for damage.

Immediately report any damage to the shipping agent.