Installation – Poweramp VS VERTICAL SPECIALTY 4.2009 User Manual
Page 14

INSTALLATION
A— Rear Imbed
B— Dock Leveler
C— Maintenance Props
D— Hinge Pins
E— lifting Lug
F— Storage Prop
6. Lube the three rear hinge pins using grease Install
the three pins in the rear imbed only through out
the first hinge tube.
7. lower the Vertical leveler down centering the
leveler’s three hinge pins with the imbeds three
pins.
• Insert the pins. Start with on outside first second
install the center pin and than the last out side
hinge pin.
• Optional use: Us a bottle jack to align the rear of
the dock leveler to the imbed channel.
8. Once the three hinge pins are installed Install the
Storage prop. Install latch pin
9.
Make all hydraulic connections.
10. Make all electrical connection.
C
D
The dock leveler is heavy. Use chains and a lifting
device with the appropriate lifting capacity and
reach. Failure to do so may result in damage to
dock leveler and/or serious personal injury or
death.
C
F
A
B
4111-0008 — April 2008
12
E