Installation procedures – Andrew 9.3-Meter ESA User Manual
Page 10
Overview
Foundation
Preparation
10
Installation Procedures
This section provides installation procedures for the 9.3-Meter Andrew Earth Station
Antenna. The installation procedures include instructions on the following antenna com-
ponents:
•
Mount
•
Reflector-to-Mount Assembly
•
Reflector
•
Subreflector
•
Enclosure
•
Feed System (C-band)
Before beginning the installation process on the ground mount assembly, ensure that
the foundation has been prepared. Foundation specifications are provided by Andrew
and may be used as a reference by civil engineering personnel when preparing the
foundation for local soil conditions. These specifications are available before the ship-
ment arrives by contacting the Customer Service Center or your Account Manager.
•
Foundation should be dimensioned as detailed in Figure 1.
•
Sweep foundation clear of any dirt or debris.
•
To ensure smooth surface for mount, scrape foundation pads as shown in Figure 2.
•
Studs should extend 3 in. above the ground and are 7/8 in. in diameter
•
Apply stick wax to stud threads to ease later connections.
Installation Procedures
Figure 1
Figure 2