beautypg.com

Installation 3.5 four-function valve installation, 6 fastprime, The fastprime – Nova-Tech LMI Roytronic Series A Metering Pump User Manual

Page 12

background image

12

INSTALLATION

3.5

Four-Function Valve Installation

To install a 4-FV, the 4-FV Fitting and Coupling Nut should be
assembled with the appropriate cartridges into the discharge port
of the pump. Use a 13/16” or 20 mm socket to tighten fitting. Tight-
ening to 50 inch-pounds is recommended. Do not over tighten.

To assemble the Four-Function Valve Body, assemble the coupling
nut and the threads at the bottom of the body. Firmly hand tighten
the body in the desired orientation. Next, insert the ¼” tubing
through the Bleed Nut. Ensure that about ¼” (6 mm) of tubing is
protruding through the tip of the Bleed Nut. Firmly hand tighten
the Bleed Nut in the hole on the side of the 4-FV. This tubing should
be routed back to the supply tank. To ensure proper function of the
priming function, the end of this tubing should not be submerged
in the solution..

This return line tubing must be secured to ensure pumped solution will safely return to supply

tank.

3.6

FastPrime™

The FastPrime

Head is equipped with a valve that allows for opening the head to at-

mospheric pressure. When installing a pump equipped with a FastPrime

Head connect

the 3/8" outer diameter clear vinyl tubing provided with the pump to the barbed nozzle.
Route the vinyl return line back to the solution tank. This tubing must not be submerged
in the solution.

Four-Function Valve Tubing Connection

Discharge

1/4"

Through

FastPrime

TM

Valve

FastPrime™ Head

3/8" Clear Vinyl Tubing

1/4" Tubing

Four-Function

Valve Body

4-FV Fitting

Coupling Nut

To Pump Head

To Solution

Tank or Drum

Bleed Nut