Air cylinder reassembly – Magnum Venus Plastech Powerhead VPH-10000 User Manual
Page 23

VPH–10000 Powerhead Manual
Rev. 05/2012
Page | 23
Air Cylinder Reassembly:
1. Install the Piston Rod Bushing (VPH-10011) with new O-rings into the Lower End Cap
and secure with the Snap Ring (7205-2-26).
2. Insert the Piston Rod (VPH-10008) through the Piston Rod Bushing (VPH-10011).
3. Slide the Cylinder (VPH-10003) over the Piston (VPH-10006) down onto the Lower
End Cap O-ring (O-B-178).
4. Set the Upper End Cap (VPH-10002) onto the Cylinder with the Valve Block flats
facing the same direction. Screw the Hex Nuts (F-HN-06F) onto the Tie Rods and
snug the Hex Nuts.
5. Position the O-rings on the back of the Pilot Valve assembly.
6. Mount the Pilot Valve assembly to the side of the End Caps using the four Cap
Screws (F-CS-04C-40-SS). Be sure the Pilot Valve is positioned correctly.
7. Install the Muffler (VPH-5004-01) to the Pilot Valve using the two Hex Bolts (F-HB-
04C-56-SS).
8. Install the Connectors (VHP-10009), Retainer (VPH-10010) and Quick Pin (7203-8-
1) into the Piston Shaft.
9. Connect the pilot air hose and regulated air hose to air motor.
- PATRIOT 10:1 ADHESIVE SYSTEM (66 pages)
- PATRIOT PAT-CP-0550 (29 pages)
- PATRIOT 10 PAT-PH-10000 (34 pages)
- PATRIOT 7 PAT-PH-7000 Series (48 pages)
- PATRIOT 5 PAT-PH-5000 Series (42 pages)
- PATRIOT 4-1_4 PAT-PH-4250 (34 pages)
- PATRIOT 3-1_4 PAT-PH-3250 Series (36 pages)
- PATRIOT HV PAT-LS-49090 (33 pages)
- PATRIOT 1-3_4 PAT-LS-24050 (60 pages)
- PATRIOT 1-1_4 PAT-LS-12270 (66 pages)
- PATRIOT SS PAT-CCP-LS-0590-SS (30 pages)
- PATRIOT PAT-CCP-LS-0590 (42 pages)
- PATRIOT PAT-CP-3000 (28 pages)
- PATRIOT PAT-CP-1530 (32 pages)
- PATRIOT PAT-CP-0980 (29 pages)
- PATRIOT PAT-CP-0245 (32 pages)
- PATRIOT FIRST TIME START-UP CHECK LIST - Internal Mix (1 page)
- PATRIOT DAILY START UP - External Mix (1 page)
- PATRIOT DAILY START UP - Internal Mix (1 page)
- PATRIOT PRE-START CHECKLIST - External Mix (1 page)
- PATRIOT PRE-START CHECKLIST - Internal Mix (1 page)
- PATRIOT SET-UP - External Mix (1 page)
- PATRIOT SET-UP FOR CHARGEABLE - Internal Mix (1 page)
- PATRIOT Multi-Color Gel Coater MVE-PAT-1500-X (60 pages)
- PATRIOT TESTING & ADJUSTING (55 pages)
- PATRIOT DAILY SHUT DOWN CHECKLIST - External Mix (1 page)
- PATRIOT DAILY SHUT DOWN CHECKLIST - Internal Mix (1 page)
- PATRIOT SPRAY FAN SETUP - External Mix (1 page)
- PATRIOT SPRAY FAN SETUP - Internal Mix (1 page)
- PATRIOT FIRST TIME START-UP CHECK LIST - External Mix (1 page)
- UltraMAX VHPC-1100 Series (25 pages)
- UltraMAX VHPC-4200 Series (26 pages)
- UltraMAX VHPC-3200 Series (39 pages)
- UltraMAX VHPC-2200 Series (34 pages)
- UltraMAX VHPC-2000 Series (32 pages)
- UltraMAX VHPC-1200 Series (25 pages)
- UltraMAX VHPC-1000 Series (38 pages)
- UltraMAX MULTI–COLOR GELCOATER MVG-1400-X-1 (50 pages)
- UltraMAX MVP Installation & Set-Up (2 pages)
- UltraMAX Shut-Down Checklist (1 page)
- UltraMAX Start-Up Checklist (1 page)
- UltraMAX Pre-Start Checklist (1 page)
- UltraMAX Start-Up Sheet Quick List Instructions (1 page)
- UltraMAX Installation (1 page)
- UltraMAX HVLS-1000 Series (40 pages)