Magnum Venus Plastech System One FRP 3101-00-01 User Manual
Page 7

FRP SystemOne
FRP SystemOne
Reassembly of Fluid Section
1. Use MVP 6706-2-1 (White Grease) to fill in the female side of each
of the four Packings in the
3101-4-01 (Packing Set Assembly) and
the 3101-3-1 (Female Compression Ring). Wipe a light coat of
White Grease on the 9201-2-28 (7/8” Chrome Ball), and the 9201-2-
36 (1 1/4“ Chrome Ball). Smear White Grease on the inner radius
on both 3101-12-1 (Piston Cups). Coat the threads on the 3101-1-1
(Packing Nut) with the White Grease.
2. Insert the 3101-6-1 (Spring Support Ring) into the 3101-7-1 (Outlet
Body), followed by the ten 9203-1-1 (Wave Springs). Place the
3101-4-01 (Packing set Assembly) on top of the 3101-5-1 (Male
Compression Ring). Set the 3101-3-1 (Female
Compression Ring )
on top of the 3101-4-01 (Packing Set Assembly). Place the entire
assembly into the 3101-7-1 (Outlet Body) with the female side of the
Packing Set facing down. Set the 3101-2-1 (Guide Bearing) into
the 3101-7-1 (Outlet Body). Screw the 3101-1-1 (Packing Nut) into
the 3101-7-1 (Outlet Body) only two to three threads.
4
Chapter
3
NOTE
Do not tighten the 3101-1-1 (Packing Nut) at this time.
- PATRIOT 10:1 ADHESIVE SYSTEM (66 pages)
- PATRIOT PAT-CP-0550 (29 pages)
- PATRIOT 10 PAT-PH-10000 (34 pages)
- PATRIOT 7 PAT-PH-7000 Series (48 pages)
- PATRIOT 5 PAT-PH-5000 Series (42 pages)
- PATRIOT 4-1_4 PAT-PH-4250 (34 pages)
- PATRIOT 3-1_4 PAT-PH-3250 Series (36 pages)
- PATRIOT HV PAT-LS-49090 (33 pages)
- PATRIOT 1-3_4 PAT-LS-24050 (60 pages)
- PATRIOT 1-1_4 PAT-LS-12270 (66 pages)
- PATRIOT SS PAT-CCP-LS-0590-SS (30 pages)
- PATRIOT PAT-CCP-LS-0590 (42 pages)
- PATRIOT PAT-CP-3000 (28 pages)
- PATRIOT PAT-CP-1530 (32 pages)
- PATRIOT PAT-CP-0980 (29 pages)
- PATRIOT PAT-CP-0245 (32 pages)
- PATRIOT FIRST TIME START-UP CHECK LIST - Internal Mix (1 page)
- PATRIOT DAILY START UP - External Mix (1 page)
- PATRIOT DAILY START UP - Internal Mix (1 page)
- PATRIOT PRE-START CHECKLIST - External Mix (1 page)
- PATRIOT PRE-START CHECKLIST - Internal Mix (1 page)
- PATRIOT SET-UP - External Mix (1 page)
- PATRIOT SET-UP FOR CHARGEABLE - Internal Mix (1 page)
- PATRIOT Multi-Color Gel Coater MVE-PAT-1500-X (60 pages)
- PATRIOT TESTING & ADJUSTING (55 pages)
- PATRIOT DAILY SHUT DOWN CHECKLIST - External Mix (1 page)
- PATRIOT DAILY SHUT DOWN CHECKLIST - Internal Mix (1 page)
- PATRIOT SPRAY FAN SETUP - External Mix (1 page)
- PATRIOT SPRAY FAN SETUP - Internal Mix (1 page)
- PATRIOT FIRST TIME START-UP CHECK LIST - External Mix (1 page)
- UltraMAX VHPC-1100 Series (25 pages)
- UltraMAX VHPC-4200 Series (26 pages)
- UltraMAX VHPC-3200 Series (39 pages)
- UltraMAX VHPC-2200 Series (34 pages)
- UltraMAX VHPC-2000 Series (32 pages)
- UltraMAX VHPC-1200 Series (25 pages)
- UltraMAX VHPC-1000 Series (38 pages)
- UltraMAX MULTI–COLOR GELCOATER MVG-1400-X-1 (50 pages)
- UltraMAX MVP Installation & Set-Up (2 pages)
- UltraMAX Shut-Down Checklist (1 page)
- UltraMAX Start-Up Checklist (1 page)
- UltraMAX Pre-Start Checklist (1 page)
- UltraMAX Start-Up Sheet Quick List Instructions (1 page)
- UltraMAX Installation (1 page)
- UltraMAX HVLS-1000 Series (40 pages)