Daily procedures, Daily start-up & shut-down – Magnum Venus Plastech PATRIOT Multi-Color Gel Coater MVG-PAT-1500XINT User Manual
Page 31

Patriot Multi-Color Operations Manual
Rev. 08/2012
Page | 31
Daily Procedures:
Daily Start-Up & Shut-Down:
External Mix Daily Start-Up:
1.
Check all hoses for damage.
2.
Check all material supplies and fill or replace as needed.
3.
Open recirculation valve on Catalyst Manifold
4.
Open main inlet air valve on the manifold.
5.
Remove the Pivot Pin from the catalyst drive.
6.
Manually pump the catalyst pump with the catalyst drive, observe catalyst
returning to the catalyst jug, pump until the stream is air free.
7.
Close recirculation valve on Catalyst Manifold.
8.
Manually pump the catalyst pump with the Slave Arm drive, bring catalyst
pressure to operating pressure 100psi.
9.
Check pump pressure, if adjustment is needed press and hold the priming button
while adjusting air pressure - slowly turn up the pump air pressure to the
operating pressure.
10.
Replace the Pivot Pin into the catalyst pump drive.
11.
Check atomizing air pressure, adjust as necessary.
12.
Lubricate the nozzle o-rings, stud o-rings and gun front threads
13.
Install nozzle, catalyst tip and retaining ring onto the front of the gun.