Pump assembly – Magnum Venus Plastech PATRIOT SS PAT-CCP-LS-0590-SS User Manual
Page 19

MAGNUM VENUS PLASTECH
Patriot SS Chop Check Manual
19
PUMP ASSEMBLY:
7.
Now install the Rod Seal Assemblies (PAT-CCP-0516) into the top of the Outlet
Body (PAT-CCP-0501-SS). The open side (side with o-ring) goes down inside.
8.
Install the Rod Bushing (PAT-CCP-0505) into the Packing Nut (PAT-CCP-0504).
9.
Thread the Packing Nut (PAT-CCP-0504) into the top of the Outlet Body (PAT-CP-
0501-SS).
10. Carefully push the Fluid Rod Assembly (PAT-CCP-0508-SS) into the Rod Seal
Assemblies (PAT-CCP-0516) from the bottom and then up through the Packing Nut
(PAT-CCP-0504)
11. Install the Backup Ring (PAT-CCP-0515) into the top end of the Cylinder (PAT-CCP-
0519-SS).
12. Install the Piston Seal Assembly (PAT-CCP-0514) into the top end of the Cylinder
(PAT-CCP-0519-SS) on top of the Backup Ring. O-ring should be facing up.
13. Install the Piston Bushing (PAT-CCP-0513) into the top of the Cylinder (PAT-CCP-
0519-SS).
Rod Seal Assembly
Rod Bushing
Outlet Body
Packing Nut
Piston Bushing
Piston Seal Assembly
Backup Ring
O-Ring
Cylinder
- PATRIOT 10:1 ADHESIVE SYSTEM (66 pages)
- PATRIOT PAT-CP-0550 (29 pages)
- PATRIOT 10 PAT-PH-10000 (34 pages)
- PATRIOT 7 PAT-PH-7000 Series (48 pages)
- PATRIOT 5 PAT-PH-5000 Series (42 pages)
- PATRIOT 4-1_4 PAT-PH-4250 (34 pages)
- PATRIOT 3-1_4 PAT-PH-3250 Series (36 pages)
- PATRIOT HV PAT-LS-49090 (33 pages)
- PATRIOT 1-3_4 PAT-LS-24050 (60 pages)
- PATRIOT 1-1_4 PAT-LS-12270 (66 pages)
- PATRIOT PAT-CCP-LS-0590 (42 pages)
- PATRIOT PAT-CP-3000 (28 pages)
- PATRIOT PAT-CP-1530 (32 pages)
- PATRIOT PAT-CP-0980 (29 pages)
- PATRIOT PAT-CP-0245 (32 pages)
- PATRIOT FIRST TIME START-UP CHECK LIST - Internal Mix (1 page)
- PATRIOT DAILY START UP - External Mix (1 page)
- PATRIOT DAILY START UP - Internal Mix (1 page)
- PATRIOT PRE-START CHECKLIST - External Mix (1 page)
- PATRIOT PRE-START CHECKLIST - Internal Mix (1 page)
- PATRIOT SET-UP - External Mix (1 page)
- PATRIOT SET-UP FOR CHARGEABLE - Internal Mix (1 page)
- PATRIOT Multi-Color Gel Coater MVE-PAT-1500-X (60 pages)
- PATRIOT TESTING & ADJUSTING (55 pages)
- PATRIOT DAILY SHUT DOWN CHECKLIST - External Mix (1 page)
- PATRIOT DAILY SHUT DOWN CHECKLIST - Internal Mix (1 page)
- PATRIOT SPRAY FAN SETUP - External Mix (1 page)
- PATRIOT SPRAY FAN SETUP - Internal Mix (1 page)
- PATRIOT FIRST TIME START-UP CHECK LIST - External Mix (1 page)
- UltraMAX VHPC-1100 Series (25 pages)
- UltraMAX VHPC-4200 Series (26 pages)
- UltraMAX VHPC-3200 Series (39 pages)
- UltraMAX VHPC-2200 Series (34 pages)
- UltraMAX VHPC-2000 Series (32 pages)
- UltraMAX VHPC-1200 Series (25 pages)
- UltraMAX VHPC-1000 Series (38 pages)
- UltraMAX MULTI–COLOR GELCOATER MVG-1400-X-1 (50 pages)
- UltraMAX MVP Installation & Set-Up (2 pages)
- UltraMAX Shut-Down Checklist (1 page)
- UltraMAX Start-Up Checklist (1 page)
- UltraMAX Pre-Start Checklist (1 page)
- UltraMAX Start-Up Sheet Quick List Instructions (1 page)
- UltraMAX Installation (1 page)
- UltraMAX HVLS-1000 Series (40 pages)