beautypg.com

Flushing & charging (continued) – AMABILIA DOUBLE O-RING GEOTHERMAL FLOW CENTERS DORFC-2 User Manual

Page 23

background image

Manual 2100-518B

Page

23 of 30

flushinG unit Only (alsO used

when rePlacinG unit, cOaXial

cOil, hOse kit Or PumP)

1. Connect unit to flow center.

2. Rotate 3-way valve to position shown in Figure 9C.

3. Remove access port caps and plugs and connect either

flush cart or Bard DORGHMT fitting (service only -

not intended for primary flush).

4. Attach garden hose to domestic water supply.

5. Purge air from garden hose before connecting to port

in flow center.

6. Attach another length of garden hose to the other port

in the flow center, leading to drain.

7. Flush flow center and unit with domestic water until

air is removed.

8. Close drain valve on discharge hose and pressurize

system to domestic water pressure (approx. 4-75

psig).

9. Remove bleed screw(s) from flow center pump

motors to purge air and replace screw(s).

10. Close valve on supply hose to trap pressure in the

system.

11. Rotate 3-way valves back to normal operating

position (see Figure 9D).

12. Remove water supply hose from flow center and

replace access port caps/plugs.

flushinG & charGinG (cOntinued)

This manual is related to the following products: