beautypg.com

Concrete pad placement for sl-100dc – Controlled Products Systems Group AOMSL100DC User Manual

Page 6

background image

5

23½”

23 ”

½

4”

6.5”

CONCRETE PAD PLACEMENT

FOR

SL-100DC

24”

24”

9½”

9½”

24”

24”

10”

10”

RED HEAD BOLTS

FOUR PLACES ½”X 3 ½”

Area for conduit(s)

Operator concrete pad

Operator frame

Operator plastic cover

GATE TRACK

GATE

GATE TRACK

FOOTING

GATE TRACK

FOOTING

Minimum 5”

10”

8”

24”

4”

When possible
Install 4” above
Ground

Footing for

Gate operator

Drive chain level for front
mount

Drive chain level for rear
mount

17”

17”

12 ’’

12 ’’

1

1

4

4

//