beautypg.com

Pad installation, Pad location – Controlled Products Systems Group 7300ETL-IL User Manual

Page 7

background image

7

PAD INSTALLATION

Pad Location

Driveway

Direction of Opening

12”

24”

24”

5”

Fig. A

Fig. B

Conduit requirements should be considered in the planning stage. If electrical power is required, a
separate conduit should be installed for electrical only. A certified electrician should be consulted for
the proper conduit material (Figure C & D).

Fig. C

AREA FOR CONDUIT

ENTRY

3”

14”

5”

Fig. D

Pad Location