beautypg.com

Wiring instructions, Left or right hand operation – Controlled Products Systems Group 7300ETL-IL User Manual

Page 12

background image

12

Left or Right Hand Operation

operator

Gate in closed position

operator

Gate in closed position

Wiring Instructions

STEP 1. Determine which direction the gate will open. The factory units are plugged into INPUT B

for right hand opening as shown in Fig. 1.

For left hand opening, disconnect from INPUT B and plug into INPUT A on the surge
board as shown in Fig. 2.

Fig. 1

Right Hand Opening

Fig. 2

Left Hand Opening

Right Side Installation

Red

Black

Green

Orange

White

Left Side Installation

Red

Black

Green

Orange

White