3 type of installations, Standard installation, Alternate installation – Controlled Products Systems Group 6500-080 User Manual
Page 13: Space gained from alternate installation

6500-065-M-10-08
11
22”
28”
22”
28”
Space Gained from Alternate Installation
Standard Installation
Operator Installation
1.3 Type of Installations
Recommended for all gate lengths opening 90°.
Concrete Pad
46”
14”
35”
23”
3”
90°
90°
90°
Alternate Installation
Concrete Pad Location
Concrete Pad Location
Operator Installation
Recommended for gates up to 14 feet opening 90°.
Gate opens in approximately 12 seconds.
Gate opens in approximately 15 seconds.
42”
36”
46”
13”
35”
23”
2”
32.5”
31.25”
38.5”
29.5”
Concrete Pad
1
2