beautypg.com

Ab c d, Connections & indicators, Rackmount – INTELLINET NETWORK 560900 24 Ports Gigabit + 4 Gigabit SFP PoE+ Web Management Ethernet Switch Quick Install Guide User Manual

Page 2: Poe+ web-managed gigabit ethernet switch english

background image

2

ENGLISH

PoE+ Web-Managed Gigabit Ethernet Switch

English

LED Status Operation
Power

On

Power on

Off

Check the AC connection; turn the power on

PoE

On

Port is linked to a PSE/PoE device

Off

No PSE/PoE device is linked

Link/Act

On

Valid port connection

& SFP

Blinking

Valid port connection; data transmitted/received

Off

No link established

ON

OFF

This guide presents the basic steps to set up and operate this device. For detailed
instructions and specifications, refer to the user manual on the CD enclosed with this
product or at intellinet-network.com.

CONNECTIONS & INDICATORS

LEDs

The LED indicators (

A

) —

Power, PoE (1-24), Link/

Activity (1-24), SFP (F1-4) —

make it easier to monitor the

switch and its connections.
Ports

All ports on the switch

support Auto-MDI/MDI-X functionality, so crossover cables and uplink ports are not

needed for connections to PCs, routers, other switches, etc. Cat5/5e/6 UTP/STP cables

provide optimal performance; if a status LED doesn’t indicate a link or activity, check

the corresponding device for proper setup and operation. The recessed Reset button

(

B

) can be pressed (using a pin or similar pointed object) to reset the switch if it isn’t

responding. NOTE: SFP ports F1-4 (

C

)

share connections with RJ45 ports 1-4 (

D

)

.

If

ports 1 and F1 are both connected to devices, only F1 will link.
Power

Use the included power cord to connect the device (next to

the On/Off switch on the rear panel) to an AC outlet.

RACKMOUNT

The switch includes brackets and screws for optional rack mounting.

1. Disconnect any cables from the switch.

2. Position a bracket over the mounting holes on one side of the switch and secure it

in place with screws.

3. Repeat Step 2 on the other side of the switch.

4. Position the switch in the rack and screw the brackets to the rack.

5. Reconnect any cables.

1 3 5 7 9 11 13 15 17 19 21 23

2 4 6 8 10 12 14 16 18 20 22 24

Power Reset

PoE

PoE

LINK/ACT

LINK/ACT

F1

F4
F3

F2

Combo

A

B

C

D