Installation instructions contents – CAME FerniE-S Kit User Manual
Page 3

INSTALLATION INSTRUCTIONS
CONTENTS
1) Stage 1:- Civil & Mechanical Section
Page
1.1
PRE-INSTALLTION CHECK
3
1.2
MOUNTING THE MOTOR BASE PLATE
4
2) Stage 2:- Wiring & Electrical
2.1
FITTING THE CONTROL PANEL IN THE CASING
6
2.2
BASIC CABLE LAYOUT
7
2.3
LOW VOLTAGE CABLE LAYOUT
8
3) Stage 3:- Installation Section
3.1
INSTALLING THE MOTORS
10
3.2
INSTALLING THE DRIVE ARMS
11
3.3
ADJUSTING THE OPEN & CLOSED CAMS
12
4) Stage 4:- Wiring & Electrical (2)
4.1
WIRING THE MOTORS
14
4.2
WIRING THE SAFETY PHOTOCELLS
15
4.3
INSERTING THE FREQUENCY CARD
15
4.4
WIRING IN THE TUNED ANTENNA
16
4.5
CODING THE REMOTE CONTROLS
16
4.6
POWERING UP THE CONTROL PANEL
16
5) Stage 5:- Commissioning the control Panel
5.1
INITIAL WIRING & CONTROL PANEL SETUP
18
5.2
OPENING & CLOSING THE GATES
19
5.3
CONTROL PANEL ADJUSTMENTS
20
5.4
AUTOMATIC CLOSE & SAFETY PHOTOCELLS
21
5.5
PROGRAMMING THE REMOTE CONTROLS TO THE
CONTROL PANEL
22
5.6
FINAL ASSEMBLEY
23
6) Troubleshooting Guide
25
7) Technical Information
7.1
TECHNICAL SPECIFICATIONS
27
7.2
MOTOR TORQUE SETTINGS
28
7.3
ZA5 CONTROL PANEL DESCRIPTION
29
7.4
ZA5 WIRING DIAGRAM
31
7.5
CONTROL PANEL ADJUSTMENTS
32
7.6
ELECTRICAL CONNECTIONS
33
8) Contact Information