5 installation, 4 dimensions 4.3 description of parts, 1 preliminary checks – CAME BX-246 Kit User Manual
Page 3
4.4 Dimensions
4.3 Description of parts
(mm)
5 Installation
Installation must be carried out by expert qualified personnel and in full compliance with current regulations.
5.1 Preliminary checks
Before installing, do the following:
• Make sure that the gate is stable, and that the castors are in good working order and properly greased.
• The ground rack must be well secured to the ground, entirely above the surface and free of any irregularities that may obstruct the
gate’s movement.
• The upper guide rails must not create any friction.
• Make sure that there is a closing and an opening endstops.
• Make sure that the operator is attached to a solid surface and protected from any impacts;
• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) power
supply;
• Check that any connections inside the container (that provide continuity to the safety circuit) are fitted with additional insulation
compared to other internal live parts;
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.
9
3
4
2
5
6
7
10
11
1 - Top cover
2 - Settings casing
3 - Control board support
4 - Endstop fins
5 - ZD2 electronic card
6 - Front cover to control panel
7 - Gearmotor release door
8 - Securing plate
9- Securing bolt
10- Securing screw plate
11- Nut
1
2
8
Pa
g.
33
-
Ma
n
u
al
c
od
e:
11
9
B
U
5
0
11
9
B
U
5
0
ve
r.
1
.0
1.
0
1
0
/2
0
0
7 © C
A
M
E c
an
celli auto
mati
ci
s.p
.a. -
Th
e d
ata an
d i
nf
or
m
ati
on r
ep
orte
d i
n thi
s i
n
stall
ati
on
manu
al ar
e s
u
sc
ep
tib
le to c
h
ang
e at an
y time an
d with
ou
t o
b
lig
ati
on
o
n C
A
M
E cancelli auto
mat
ici s.p
.a. to n
ot
ify u
ser
s.
ENGLISH