beautypg.com

English, 4 preparing the foundation box – CAME Superfrog User Manual

Page 6

background image

6

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n r

ep

o

rt

ed

i

n

t

h

is

i

n

st

al

la

ti

o

n

m

an

u

al

a

re s

u

sc

ep

ti

b

le to c

h

an

g

e a

t a

n

y t

im

e a

n

d w

it

h

o

u

t o

b

li

g

at

io

n o

n

C

AM

E c

an

ce

ll

i a

u

to

m

at

ic

i s

.p

.a

. to n

o

ti

fy

u

se

rs

.

ENGLISH

The following applications are only examples, as the space required for unit installation and the accessories vary de-

pending on dimensions and therefore it is up to the installer to select the best solution.

Note: the following sketches show how to install the right-hand foundation box (CD).

- Dig a pit to place the foundation box into, set up the
required cable boxes and corrugated conduits – for the
connections coming from the branching pit – and the
drainage tube.
Note: the number of cables depends on the type of system
and the accessories installed.

5.4 Preparing the foundation box

- Level the foundation
box with the ground
and position the
pinion of the
foundation box in line
with the top hinge of
the gate.

- Fill the pit with concrete and sink the foundation box

into it, making sure that the corrugated and drainage

tubes pass through the proper holes.