English, 4 preparing the foundation box – CAME Superfrog User Manual
Page 6

6
T
h
e d
at
a a
n
d i
n
fo
rm
at
io
n r
ep
o
rt
ed
i
n
t
h
is
i
n
st
al
la
ti
o
n
m
an
u
al
a
re s
u
sc
ep
ti
b
le to c
h
an
g
e a
t a
n
y t
im
e a
n
d w
it
h
o
u
t o
b
li
g
at
io
n o
n
C
AM
E c
an
ce
ll
i a
u
to
m
at
ic
i s
.p
.a
. to n
o
ti
fy
u
se
rs
.
ENGLISH
The following applications are only examples, as the space required for unit installation and the accessories vary de-
pending on dimensions and therefore it is up to the installer to select the best solution.
Note: the following sketches show how to install the right-hand foundation box (CD).
- Dig a pit to place the foundation box into, set up the
required cable boxes and corrugated conduits – for the
connections coming from the branching pit – and the
drainage tube.
Note: the number of cables depends on the type of system
and the accessories installed.
5.4 Preparing the foundation box
- Level the foundation
box with the ground
and position the
pinion of the
foundation box in line
with the top hinge of
the gate.
- Fill the pit with concrete and sink the foundation box
into it, making sure that the corrugated and drainage
tubes pass through the proper holes.