beautypg.com

5 installation, English 4.3 dimensions, 2 tools and materials – CAME Frog-A 24v User Manual

Page 3: 1 preliminary checks

background image

3

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n s

h

ow

n i

n

t

h

is

d

ia

lo

g

u

e m

ay b

e c

h

an

g

ed by C

am

e C

an

ce

ll

i A

u

to

m

at

ic

i S

.p

.A

. a

t a

n

y t

im

e w

it

h

o

u

t p

ri

o

r w

ar

ning

.

ENGLISH

4.3 Dimensions

Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and com-
pliance with the current standards and regulations. The following figure illustrates the minimum equipment needed by the
installer.

5.2 Tools and materials

5 Installation

Before installing, do the following:

• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off)
power supply;
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage;
• Fit tubing to drain away any water leaks which may cause oxidation;
• Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra
insulation as compared to the other conductive parts inside;
• Make sure the structure of the gate is sturdy, the hinges work and that there is no friction between moving and non-moving
parts;
• Make sure there is a mechanical stop for opening and closing.

Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

5.1 Preliminary checks

405

330

160

60

67