Brooks, Models bm01 and bm02, Installation – Brooks Instrument BM02 User Manual
Page 12: Installation and operation manual

2-2
Installation
Brooks
®
Models BM01 and BM02
Installation and Operation Manual
X-PD-BM01-02-eng
Part Number: 541B042AHG
March, 2008
2-4 Return Shipment
Prior to returning any instrument to the factory, contact your nearest Brooks
location for a Return Materials Authorization Number (RMA#). This can be
obtained from one of the following locations:
Brooks Instrument
407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554-FLOW (3569)
Tel (215) 362-3700
Fax (215) 362-3745
E-mail: [email protected]
www.BrooksInstrument.com
Brooks Instrument
Brooks Instrument
Neonstraat 3
1-4-4 Kitasuna Koto-Ku
6718 WX Ede, Netherlands
Tokyo, 136-0073 Japan
P.O. Box 428
Tel 011-81-3-5633-7100
6710 BK Ede, Netherlands
Fax 011-81-3-5633-7101
Tel 31-318-549-300
Email: [email protected]
Fax 31-318-549-309
E-mail: [email protected]
Any instrument returned to Brooks requires completion of Form RPR003-1,
Brooks Instrument Decontamination Statement, as well as, a Material
Safety Data Sheet (MSDS) for the fluid(s) used in the instrument. This is
required before any Brooks Personnel can begin processing. Copies of the
form can be obtained from any Brooks Instrument location listed above.
2-5 Transit Precautions
To safeguard against damage during transit, transport the instrument to the
installation site in the same container used for transportation from the
factory if circumstances permit.
2-6 Removal from Storage
Upon removal of the instrument from storage, a visual inspection should be
conducted to verify its "as-received" condition. If the instrument has been
subject to storage conditions in excess of those recommended (See
Section 2-3), it should be subjected to a pneumatic pressure test in
accordance with applicable vessel codes.