Remote Condenser Installation
Guidelines

Chiller Operation and Maintenance

Pressure and Temperature Log

A log of temperatures and pressures should be taken
regularly. Periodically conduct a visual inspection of the
chiller to identify problems before they reach the point of
failure. As with mechanical system, it is necessary to conduct
a series of checks to the ClimaCool chiller to confi rm correct
operation.

Maintaining a Daily Log


"

" " " " "

"

"





!

Daily

A daily operational log should be kept.

Perform visually inspection.

Record entering and leaving chiller water temperatures
and pressures.

Note any problems that may exist and immediately plan
for further investigation. If repair is necessary, schedule
for earliest possible date.

Properly document all data taken.

Weekly

Review daily log from previous week.

Perform visual inspection.

Properly document all data taken.

Note any problems that may exist. Immediately plan for
further investigation. If repair is necessary, schedule for
earliest possible date.

Quarterly

Check controller operating parameters and setpoints.

Check temperature drop/rise on heat exchanger. *

Check compressor oil level.

Check compressor oil color.

Check water fl ow rates and pressure drops across
evaporator heat exchanger.

Properly document all data taken.

*

The temperature drop/rise on a fully loaded (both compressors)
heat exchanger is generally 10°F. If only one compressor is
running the temperature drop/rise will be approximately 5°F.
Some projects are designed to have a higher temperature drop
on the evaporator depending on application. Consult the bank
performance sheet for your project for these values. If the
temperature drop/rise is greater than the design, your heat
exchanger may need to be back fl ushed or the strainer may need
to be cleaned.

Annual

Back fl ush all heat exchangers. If fouling is suspected
use only ClimaCool recommended de-scalers (see page
47 - Chemical Clean In Place Washing).

Remove and clean all waterside strainers.

Manually operate all waterside isolation valves, if
provided, on each module.

Check all electrical connections for tightness.

Perform leak check on all refrigerant circuits.

Check all header piping couplings for tightness.

Check oil level and color on each compressor.

Check and test all refrigerant safeties for proper
operation.

Check all peripheral systems for proper operation.

Check and test CoolLogic Master Control System.

Verify set points, sensors and general control
confi guration.