Power system installation and connection, Tools required, Ower – Alpha Technologies Te17 User Manual
Page 21: Ystem, Nstallation and, Onnection, 1 tools required
A
RGUS
T
ECHNOLOGIES
T
E
17 O
UTDOOR
E
NCLOSURE
I
NSTALLATION
6 P
OWER
S
YSTEM
I
NSTALLATION AND
C
ONNECTION
This section is provided for qualified personnel to install and interconnect the power components within
the Argus Outdoor Enclosure. For battery installation refer primarily to the manufacturer’s guidelines for
more specific information.
6.1 Tools
Required
Various tools are essential for DC power system installation. Use this list as a guide:
• Socket pin-head key for enclosure doors, Argus #647-060-10
• Battery lifting apparatus (as required)
• Various crimping tools and dies, to match lugs used in installation
• Digital voltmeter equipped with test leads
• Load bank of sufficient capacity to load largest rectifier into current limit
• Cable cutters
• Torque wrench: 1/4” drive, 0-150 in/lbs
• Torque wrench: 3/8” drive, 0-100 ft/lbs
• Insulating canvases as required (2’ x 2’, 1’ x 1’, 3’ x 3’, etc.)
• Various insulated hand tools (see Figure 9) including:
-Combination wrenches
-Ratchet and socket set
-Various screwdrivers
-Electricians knife
• Battery safety spill kit (required for wet cells only) including:
-Protective clothing
-Face shields
-Gloves -Baking
soda
-Eye wash equipment
• Cutters and wire strippers (#14 to #22 AWG) [0.34 to 2.5 mm2].
Figure 9–Example of an insulated tool kit
NOTE: Review the safety instructions provided at the beginning of this manual.