Enclosure installation, Enclosure preparation, Nclosure – Alpha Technologies Te17 User Manual
Page 17: Nstallation, 1 enclosure preparation

A
RGUS
T
ECHNOLOGIES
T
E
17 O
UTDOOR
E
NCLOSURE
I
NSTALLATION
4 E
NCLOSURE
I
NSTALLATION
4.1 Enclosure
Preparation
Remove the protective covering from the system.
The doors may be opened with a socket pin-head key, Argus #647-060-10.
(images not to scale)
Figure 4–Illustration of door latch and socket pin-head key for Te17 panels
The door panels are designed to be locked with a pad-lock and are secured for shipping using tie-wraps.
Cut these away and open all doors. Inspect the packing slip to verify that all equipment is there.
All documentation is in a plastic bag and located inside the equipment compartment.
If batteries are on a separate pallet, they should not be installed until after the enclosure has been secured.
If the batteries are going to be placed within the enclosure, the inter-unit connectors must be installed.
Inspect moving parts, hardware, connectors, and installed equipment. In case of damage, report it ac-
cording to procedure. Remove and properly dispose of all packaging.
Remove the 4 bolts securing the enclosure riser to the pallet. They are accessible from inside the riser bot-
tom corners:
Figure 5–Bottom views of Te17 riser (pallet bolts)
Typical left side, 2PL
Typical right side, 2PL
030-729-C0 R
EV
A
P
AGE
5
OF
14