beautypg.com

Installation and operation, 1 unpacking – Alpha Technologies Continuity: 6K_10K User Manual

Page 14

background image

0170012-J0 Rev A

12

3.  Installation and Operation

Read Section 1 (Important Safety Instructions) before installing the UPS

3.1  Unpacking

Inspect the UPS upon receipt. The manufacturer has designed robust packaging for your product, but

accidents and damage can occur during shipment. Notify the shipper and dealer if there is damage.
The packaging is recyclable; save it for reuse or dispose of it properly.
Remove the UPS from the cardboard box. Check that the following standard contents are included:
• One (1) user manual
• UPS communication software CD with RS232 cable
• Accessories shown below for Continuity 6K or Continuity 10K model
• Additional 1 piece of wire for a UPS with dual input but no isolation transformer (#8 for 6kVA and #6

for 10kVA).

(Note: Wire is used at the input/output terminal block of the UPS.

X1

A1

X1

A2

X2

A3

All Continuity models

Continuity 10K only

(

10K x 5

)