beautypg.com

Plank wall mount asymmetric, Step 1 step 2 step 3, Technical installation data – Alera Lighting PLKWMASYM User Manual

Page 2

background image

© 2009 Alera Lighting, a division of Hubbell Lighting, Inc. Because of continuing product improvement programs, Alera Lighting reserves the right to change specifications
without notice. 701 Millennium Blvd. Greenville, SC 29607 / Tel 864.678.1000 / Tech Support 864.678.1580 / Website www.aleralighting.com

Page 2/6 Rev. 11/30/09

BeAMS / PLK WM AsyM TID

Plank Wall Mount asyMMetric

Technical Installation Data

Install wall brackets at the desired elevation and at intervals

per Page 1. Only use screws with flat contact faces. Taper-head

screws will cause brackets to shift during installation. Bracket

elevation should be accurately controlled to ensure level rows.

#12 or #14 Screws
(Supplied by others)

Wall Bracket

Wall Bracket

Desired fixture height

#6 or #8 Screws
(supplied by others)

Wall cleat for cable option

Install J-Boxes so that the top of the openings are 3 1/4"

to 3 1/2" above the intended height of the fixture. This

will give a J-Box opening of 1 1/8" to 1 3/8" above the top

of the wall bracket/fixture.

Step 1

Step 2

Step 3

2"× 4" J-Box
(Supplied by others)

Desired Fixture Height

3 1/2"
3 1/4"

Wall Bracket

2"

1 3/8"
1 1/8"

Install optional wall cleats, if provided, using two (2) #4 screws

(supplied by others) at the height shown above and at the

intervals per Page 1.