beautypg.com

M, ma cable mount, Technical installation data – Alera Lighting M, MA Cable Mount User Manual

Page 2

background image

© 2010 Alera Lighting, a division of Hubbell Lighting, Inc. Because of continuing product improvement programs, Alera Lighting reserves the right to change specifications
without notice. 701 Millennium Blvd. Greenville, SC 29607 / Tel 864.678.1000 / Tech Support 864.678.1580 / Website www.aleralighting.com

Page 2/2 Rev. 08/02/10

ReCeSSed / M, MA CM TID

M, MA CAble Mount

Technical Installation Data

Strain Relief

Bushing

Strain Relief

Bushing

hAnger Kit

Ceiling Plate

Stud

J-Box Strap w/

ground screw

Cable Assembly

Cable Assembly

SJT Power Cord

SJT Power Cord

Housing

Bushing

Cable hanger attaches directly to the aluminum housing.

1.

SJT Power Cord is fed into the housing and the strain relief bushing is

2.

pressed into the housing preventing the power cord from backing out.

Attach connector brackets to reflector on

1.

each housing using the #8 screws. Ensure
the angles are in the same direction on each
housing. (4 total)
Insert Top Light Seal halfway into one of the

2.

Housings.
Insert Aligner with Pem Studs into the "C"

3.

channel slots on one of the housings (2
total)
Use the #8 nuts to secure the aligner to the

4.

housing A. (2 total)
Attach each Light Seal to the Aligner using

5.

the #8 nuts. Do not tighten the nut at this
point. (2 total)
Butt Housing B against Housing A while

6.

engaging Top Light Seal and electrically
connecting in-row wiring.
Engage the connector brackets with the

7.

screws provided. Tighten the screws until
the housings are pulled together.
Secure the Aligner in Housing B with #8

8.

nuts provided and tighten.
Tighten the nuts on the side light shields.

9.

ConneCtion inStruCtionS

Housing A

Housing B

Aligner w/ Pem

Studs (2 places)

#8 Nuts

(6 Places)

Light Seal (2 Places)

#8 Screws (6 places)

Conn Brackets (4 Places)