Elmo Rietschle L-BV3 User Manual
Page 18
Commissioning
610.444430.40.000
18 / 32
© Gardner Denver Deutschland GmbH
7.3
Operation with operating-liquid feed
See Fig. 5, Pg. 18, and Fig. 8, Pg. 19, as well
as Fig. 6, Pg. 19, and Fig. 7, Pg. 19.
Proceed as follows here:
Method A:
1) Set pre-pressure of operating liquid (Fig. 5,
Pg. 18):
Set a pre-pressure p
A
in the feed pipe for
the operating liquid (Item A) around
approx. 100 kPa [14.5 psi] above the inlet
pressure p
B
in the inlet pipe (Item B).
A
P
A
=P
B
+100 kPa
P
A
=P
B
+14,5 psi
B
6104443001006
Fig. 5: Setting the operating-liquid flow rate:
Setting pre-pressure
A Feed pipe for operating liquid
B Inlet
pipe
2) Start up the unit:
For non-automatic operation (Fig. 6, Pg. 19):
Open the stop valve (Item 4) manually.
The operating liquid is fed in.
Switch on the unit.
For automatic operation (Fig. 7, Pg. 19):
Switch on the unit.
The solenoid valve (Item 4) opens
and the operating liquid is fed in.
Method B:
1) Start up the unit:
For non-automatic operation (Fig. 6, Pg. 19):
Open the stop valve (Item 4) manually.
The operating liquid is fed in.
Switch on the unit.
For automatic operation (Fig. 7, Pg. 19):
Switch on the unit.
The solenoid valve (Item 4) opens
and the operating liquid is fed in.
2) Check the operating-liquid flow rate:
with the flow meter (Fig. 6, Pg. 19, and
Fig. 7, Pg. 19, Item 2)
OR
by measuring the volume of operating liquid
per unit of time that exits at the discharge
connection with a graduated vessel (Fig. 8,
Pg. 19)
3) Set/correct the operating-liquid flow rate:
via the control valve (Fig. 6, Pg. 19, and
Fig. 7, Pg. 19, Item 3)
Nominal operating-liquid flow rate:
For nominal values, see Chapter 3.3,
"Operating conditions", Section "Nominal
operating-liquid flow rate", Pg. 8.