Commissioning and decommissioning

6.2 Decommissioning/

storing

top the machine

a) Switch the machine off.

b) If available close the cut off device in the suction

and pressure pipe.

c) Disconnect the machine from the electricity

source.

d) Depressurise the machine: Open the pipes

slowly.

The pressure reduces slowly.

e) Remove the pipes and hoses.

f) Seal the connections for suction and pressure

nozzles using adhesive foil.

g) Insert the desiccant bag into the fi lter housing.

see also Section 3.2.1, Page 11

6.3 Re-commissioning

a) Check the condition of the machine (cleanliness,

cabling etc.).

b) Drain the preserving agents.

c) Remove the desiccant bag from the fi lter hous-

ing.

For installation see Section 5 Page 14

For commissioning see Section 6.1 Page 17