Unpacking and inspection – Net Optics 10_100_1000BaseT Tap User Manual
Page 7

Gig Zero Delay Tap & 10/100/1000BaseT Tap
4
About This Guide
This guide explains how to install the Gig Zero Delay Tap and the
10/100/1000BaseT Tap. Please read the Guide before attempting to install
the device.
This guide covers the following models:
• TP-CU3-ZD
10/100/1000 Tap with Zero Delay
• TP-CU3-ZD-DC 10/100/1000 Tap with Zero Delay, -48V DC power
• TP-CU3
10/100/1000 Tap
• TP-CU3-DC
10/100/1000 Tap , -48V DC power
Unpacking and Inspection
Carefully unpack the Gig Zero Delay Tap and check for damaged or missing
parts. The Tap ships with the following:
• (1) Tap device
• (2) power supplies (TP-CU3-ZD and TP-CU3 only)
• (2) power cords (TP-CU3-ZD and TP-CU3 only)
• (1) retainer clip (TP-CU3-ZD and TP-CU3 only)
• (1) network cable, 3 meter, straight-through (purple)
• (1) network cable, 3 meter, cross-over (green)
• (2) monitor cables, 3 meter, straight-through (purple)
• (1) Installation Guide
You may have also ordered a panel for rack mounting and an extended warranty.
Carefully check the packing slip against parts received. If any part is missing or
damaged, contact Net Optics Customer Service immediately.
Warning! ____________________________________________________________
For the TP-CU3-ZD and TP-CU3 models, use only the power supplies pro-
vided by Net Optics for use with this product. Use of other power supplies may
result in a safety hazard that could cause damage or injury.
_______________________________________________________________________