beautypg.com

Teatro installation instructions – Theatre Solution Teatro Auditorium Seating User Manual

Page 32

background image

Teatro Auditorium Seating Installation Instructions

31

Teatro Installation Instructions

(Note: See Exploded Assembly [Figure 5] and Floor Mounting Details [Figure 6] on following pages. )

1. Use approved floor plan to establish hole locations for the foot plates. Note that the chair radius line coincides

with the front hole of the foot plate. Accurate center-to-center width spacing is critical to a proper installation.
Tolerance on the chair width dimension is plus or minus 1/8". It is critical not to exceed this tolerance on width
spacing.

2. When mounting chairs over carpet, punch two 5/8" diameter holes in carpet to match holes in the chair base

plate. Bolt leg frames to floor as per the appropriate anchoring method. Use 1/4" flat head machine bolt or wood
screws and countersink lock washers. Hand-tighten bolts to allow for some slight movement in the leg frame.
(See Figure 4.)

3. Attach back as follows: From the front, slip bottom two attachment bolt heads into round end slots (A) in leg

frame bracket (D). Adjust bolt heads to insure snug fit to inside of leg frame bracket (See Detail ‘A’). Rotate top
of back rearward so that the top two attachment brackets (E) align with threaded holes at the top of leg frames
(B). Install 1/4-20 x 5/8” SEMS machine screws through round end slots in brackets of adjacent backs. (See
Detail ‘B’) Use one bracket only on end leg.

4. Orient the seat to the approximate occupied position and lower onto seat hinges (C). Install four 1/4-20 x 5/8”

SEMS machine screws through slots in seat brackets and fasten to hinges. Insure seat is centered between legs
prior to final tightening.

5. Flip seat up and down several times to insure that it pivots and returns to upright position freely. Adjustments can

be made to the attachment bolts in either the seats or the backs.

6. Attach armrest by placing the routed area on the underside of the armrest over the formed gusset (B) at the top

of leg frame. Secure using one 10-24 x 1" machine screw at the front and one 10-24 x 2-1/2" machine screw at
the rear.

7. Tighten all floor attachments securely.