ABA & ABY Installation (continued)

Check Installation

AirBaths: Make sure the blower has ample unobstructed space to draw air and that the space is clear of dust and debris.

All bathtubs: Make sure the bathtub is level and supported by the feet or wood base or mortar sub-floor and not the flange lip.

Clean Up

When cleaning after installation, do not use abrasive cleaners, as they may scratch and dull the surface. Use warm water and a
liquid non-abrasive detergent to clean the surface.

Stubborn stains, paint or tar can be removed with isopropyl (rubbing) alcohol. Rinse well and dry with a soft, clean cloth.

Do not use metal scrapers, wire brushes or other metal tools.

Trial Operation

Close the drain.

Fill the bathtub.

Check for leaks from the air jets (AirBath only).

Check for leaks from the drain.

Check plug voltage and verify the Control Panel activates then the “ON” button is
pressed. (AirBath only - see Owner manual)

Check operation. (AirBath only - see Owner manual)

After operation, drain the bathtub and run the Automatic Maintenance Cycle.
(AirBath only - see Owner manual)

8

9

10

ABF Installation with access under the floor

Preparation

Clean, level and prepare the floor for installation.

Place the unit in the exact installed position on the floor. Be sure the tub is resting on the bottom supports and not the acrylic.

Determine the location of the drain pipe on the floor by taking measurements of the drain and waste location underneath the unit.
(Drain and waste locations will vary by model.)

Carefully place the unit on a blanket, cardboard, or other clean protective surface so that the unit is properly supported.

Clean the drain hole area in preparation of setting the drain. The area should be dry and free of any debris.

1

Drain

Jet Fitting