Aba & aby installation (continued), Finish decking and seal bathtub, Connect the drain to plumbing – Factory Direct Hardware Toto ABA782L User Manual

Page 3: Make electrical connections (airbath)

background image

Finish decking and seal bathtub

ABA & ABY Installation (continued)

Connect the drain to plumbing

Follow local codes

Make sure that connections are tight to avoid leaks.

5

Make electrical connections (AirBath)

All electrical connections must be made by a licensed electrician and
meet local codes. Refrain from using extension cords.

Class A, 15 amp Ground Fault Control Interrupter (GFCI) with grounding
is required.

The controller, blower and GFCI must be accessible.

6

7

With Flange

Silicone

With Tile-in Flange

• Pre-drill pilot holes through the tile-in flange.
• Mount with screw or nail to studs.
• Finish tiling the bathtub deck and be sure to seal the

bathtub lip to prevent leaks.

Silicone

Finished Surface

Optional Under Mount

• See spec sheet to determine if this is available
• Cut finished surface to desired dimensions.
• Dry fit to the bathtub.
• Temporarily mark on the bathtub the edge of the opening of the finished surface.
• Remove the finished surface and apply silicone to the bathtub (underneath the

finished surface location).

• Replace the finished surface and secure it.
• Add and/or remove silicone as desired.
• Make sure the finished surface is not supported by the bathtub and is secured per