beautypg.com

Optional caulking – Swanstone SA-38 NEO - Installation User Manual

Page 24

background image

3.

Apply a bead of color coordinated caulk in a "box"
design, as shown. This "box" should be sized to the
width of the bottom of the side panel.

4.

Once the side panel is seated on the threshold,
color coordinated caulk must be forced out beyond
the finished sides of the end panel, as shown.

5.

Remove the excess color coordinated caulk to give
a finished appearance.

Note: The color coordinated caulk must not interfere
with the water return channel, visible just inside the
threshold.

6.

Apply a continuous bead of color coordinated caulk
to the horizontal seam between the shower floor and
the side and back panels. This color coordinated
caulk seam must start approximately 1/4" away from
the beginning of the water return channel, as shown.

Note: Do not cover any water return channels with
silicone caulking.

7.

Apply a continuous bead of color coordinated caulk
along all vertical seams where side and back panels
meet.

8.

Immediately remove the excess caulk to give a
finished appearance.

Follow the manufacturer’s instructions on the tube for
proper application. Allow at least 24 hours for caulk to set
before using the shower enclosure.

IMPORTANT NOTICE

Optional Caulking

800-325-7008

24

The Swan Corporation