beautypg.com

Warning – Swanstone STMK72-3662 - Installation User Manual

Page 10

background image

1.

Place the panel on top of the tub and slide it against the
back wall panel.

2.

Scribe (mark) the panel, as shown. If the panel is wider
than the wall, take this width into consideration when
scribing the panel.

Flat Panel

Square Tile or Subway Tile

Note: Precisely scribing and cutting the panel will provide a

clean 90 degree corner with no need for corner
molding.

Dust Hazard
When cutting or drilling the Swanstone
product, use a dust collection method which

prevents dust particles from going into the air. Always
work in a well-ventilated area. To keep the area well-
ventilated, open windows and use exhaust fans. Always
use an OSHA approved dust mask when cutting, drilling, or
sanding Swanstone products.

3.

Place the wall panel, finished side facing up, on a flat
surface. Place pieces of masking tape over the area where
the saw contacts the Swanstone panel.

4.

Cut the panel using a circular saw with a 60-80 tooth
carbide blade or a saber saw with a bi-metal blade (14
teeth per inch).

5.

Measure the openings for the tub/shower faucet(s) and/or
shower head.

6.

Transfer the measurements to the panel.

7.

Cut clearance holes using a router, saber saw, or hole
saw. Drill or cut from the finished side of the panel. For
best results, when drilling, place a scrap of wood beneath
the hole to ensure a clean cut.

WARNING

The Swan Corporation

10

800-325-7008

Installation Procedure