7.6 Fall Stop Assembly
7.6.1 General
The slack fall stop is a safety stop, not a functional stop. The fall stop must be located at least six
(6.0) inches [150mm] from end of last chain link.
Figure 16. Cross Section of Slack Fall Stop
6
''
1
2
3
3
7.6.2 Removing fall stop (Figure 16)
1. Remove cotter pin (item 1).
2. Slide up the tube (item 2).
3. Remove the two fall stop halves (item 3).
4. Slide tube (item 2) off load chain.
7.6.3 Fall Stop Installation (Figure 16)
1. Slide tube (item 2) onto load chain.
2. Position two fall stop halves (item 3) on a chain link so that the fall stop will be at least 6 inches [150mm]
from end of load chain.
3. Slide tube (item 2) down over two fall stop halves (item 3).
4. Insert and secure cotter pin (item 1).