beautypg.com

Installation to threaded rod, FI g. 4.1 fi g. 4.2 – Peerless-AV PRS45 - Installation User Manual

Page 7

background image

ISSUED: 08-15-07 SHEET #: 055-9188-8 06-04-11

Visit the Peerless Web Site at www.peerlessmounts.com

7 of 13

For customer care call 1-800-865-2112 or 708-865-8870.

3/8 -16 THREADED ROD

(NOT INCLUDED)

Thread two 3/8-16 hex thin nylon-insert locknuts (not included) on two 3/8-16 threaded rods (not included) to the
desired height of projector mount assembly. Attach projector mount assembly (A) to the two 3/8-16 threaded rods
using two 3/8-16 hex thin nylon-insert locknuts as shown in fi gure 4.1 or fi gure 4.2.

A

Installation to Threaded Rod

(Not evaluated by UL - Professional installation only)

3/8 -16 THREADED ROD

(NOT INCLUDED)

A

3/8 -16 HEX THIN
NYLON-INSERT
LOCKNUT
(NOT INCLUDED)

4

3/8 -16 HEX THIN
NYLON-INSERT
LOCKNUT
(NOT INCLUDED)

3/8 -16 HEX THIN
NYLON-INSERT
LOCKNUT
(NOT INCLUDED)

3/8 -16 HEX THIN
NYLON-INSERT
LOCKNUT
(NOT INCLUDED)

FRONT OF
MOUNT

FRONT OF
MOUNT

fi g. 4.1

fi g. 4.2