Peerless-AV SR560M-AW - Installation User Manual
Page 7
7 of 15
ISSUED: 09-22-11 SHEET #: 009-9059-1
Slide shelf support (C) onto upright (G) so that 1/4-20 nuts (J) slide into slots of upright (G) as shown in fi gure 5.1
and detail 1. Slide shelf support to desired height, level, then tighten 1/4-20 x 12mm screws (I) using 4 mm allen
wrench (N).
NOTE: MAXIMUM OF TWO SHELVES
Max height of top shelf is 34" from base.
Max height of second shelf is 28" from base.
SLOT
fi g. 5.1
C
5
DETAIL 1
J
G
See also other documents in the category Peerless-AV Furniture:
- ESHV30 - Installation (27 pages)
- HCC101 - Sell Sheet (2 pages)
- PM47S - Sell Sheet (2 pages)
- HCC201 - Sell Sheet (2 pages)
- PM610G - Installation (5 pages)
- ACCXT301 - Installation (11 pages)
- PS200 - Installation (21 pages)
- ACCXT300 - Installation (17 pages)
- ESHV10 - Sell Sheet (2 pages)
- ACC328 - Sell Sheet (2 pages)
- ACCSH200 - Sell Sheet (2 pages)
- ACCXT302 - Installation (17 pages)
- PS200 - Sell Sheet (2 pages)
- ESHV30 - Sell Sheet (2 pages)
- HCC401 - Sell Sheet (2 pages)
- ACCXT302 - Sell Sheet (2 pages)
- HCC201 - Installation (12 pages)
- HCC201 - Installation (16 pages)
- HCC401 - Installation (12 pages)
- AVM - Sell Sheet (2 pages)
- ACC328 - Installation (2 pages)
- ACCXT301 - Sell Sheet (2 pages)
- ACC953 - Sell Sheet (2 pages)
- AVL - Sell Sheet (2 pages)
- ACC953 - Installation (14 pages)
- PM610 - Installation (10 pages)
- HCC301 - Sell Sheet (2 pages)
- ESHV20 - Sell Sheet (2 pages)
- HCC101 - Installation (12 pages)
- ESHV20 - Installation (27 pages)
- ACCXT300 - Sell Sheet (2 pages)
- PM47S - Installation (4 pages)
- ACCSH300 - Sell Sheet (2 pages)