PowerWalker VI 750R User Manual
Page 26

EBM and EBM integrate a rack form
VI-3000R
Install the 3000VA series into 19” rack as shown below.
.
1. Turn on the UPS and connect the load.
2. After installing the UPS into rack, the load may be connected. Make
sure the load equipment is turned off, then plug all loads into the
output receptacle properly protected by a circuit breaker of fuse in
accordance with national and local electrical codes.
29
26