Drain hole locations, Caution – Pace-Edwards JR Series Nissan Frontier Crew Cab Extra Short Bed User Manual
Page 2
JACKRABBIT® SERIES FRONTIER
2
Read the instructions carefully before you start. These instructions are written for one-person installation. We
have noted where briefl y having an extra person’s assistance can make installation easier. If you have questions
regarding the installation please call our Technical Support Line at (800) 338-3697.
DRAIN HOLE LOCATIONS:
The JackRabbit is designed to carry rainwater from the cover into
the canister and then out through the drains. Most truck models
have standard OE drain holes or plastic/rubber access ports in the
front of the truck bed. Check to make sure your truck has the OE
drain holes so that drilling into the sheet metal is not required. If
drilling is necessary, be sure to check the underside of the truck bed
for the best location. The holes should be located near the side and
as far forward as possible. Use a drill bit suitable for sheet metal
(such as a taper drill or step drill). Drill drain tube clearance holes at
3/4” (19mm). This will need to be done before installing the cover.
Drain Tube Holes
Note: There should be no drilling into the truck body needed on most standard or full-size trucks
.
1/2” wrench or socket
#2 Phillips screwdriver
Wire Cutters
Tape measure
TOOLS REQUIRED FOR ASSEMBLY:
BEFORE YOU START:
PACKAGING CONTENTS:
Canister
Rails
(Left &
Right)
Drain
Tubes
Clamp
Pack
Hardware
Pack
Top Cover
Rails Come in a
separate Box.
DO NOT USE A KNIFE TO
OPEN THE RAIL BOX.
OPEN THE RAIL BOX ALONG
THE LENGTH OF THE BOX
AND LIFT RAILS OUT TO
AVOID SCRATCHING THE
SURFACE OF THE RAILS ON
THE PACKAGE STAPLES.
CAUTION!
IF YOU HAVE ANOTHER PERSON TO HELP STEADY THE CANISTER,
IT MAY BE EASIER TO INSTALL THE RAILS (DESCRIBED IN STEP 3)
BEFORE POSITIONING THE CANISTER IN THE TRUCK BED.
JACKRABBIT
Made in the USA
by Pace Edwards Co.
Model #
Serial #
JACKRABBITTM TONNEAU COVER by:
(800)
338-3697