Grain Systems PNEG-1530 User Manual
Instructions, Wiring diagrams, Installation
Date: 10-12-09
PNEG-1530
Instructions
1004 East Illinois Street • Assumption, IL 62510 • 1-217-226-4421
PNEG-1530
Page 1 of 5
Printed in the U.S.A.
Copyright © 2009 by GSI Group
www.gsiag.com
Wiring Diagrams
Electronic HH-1089 Time Delay Reset Wiring Instructions
Use this page to install the HH-1089E as a replacement to the HH-1089 time delay reset switch in early
model heaters. Refer to
of the electronic time delay to identify the connection
terminals. Connect the wires according to the symbols used on
with the symbols in
the wiring schematics for the heaters.
Installation
1. Remove old time delay reset from the control box.
2. Install new time delay into existing hole in heater control box and secure with the nut provided.
3. Connect wire lead from the solenoid circuit to terminal #1 on the time delay. (Symbol A)
4. Connect wire lead from the flame probe to terminal #3 on the time delay. (Symbol B)
5. Connect wire lead from the housing High-Limit to terminal #4 on the time delay. (Symbol C)
6. Connect one end of the supplied wire for the neutral circuit (white with black stripe) to the “N” terminal
of the time delay. (Symbol D)
7. Connect the other end of the supplied wire for the neutral circuit to terminal #2 in the heater
control. (Symbol D)
Refer to the operating section
of this instruction sheet for reference to the time delay operation.