beautypg.com

Shutdown – Grain Systems Unload Augers PNEG-1057 User Manual

Page 27

background image

Shutdown

19

PNEG 1057 - 8" & 10" Commercial Vertical Bin Unloading Auger

1. Normal Shutdown

A. Make certain that bin well and unloading tubes are empty before stopping the unit.

B. Disconnect and lockout the power source before leaving the work area.

Never restart when under a full load. Starting unit under load may result in damage

to the machine. Such damage is considered abuse of the equipment.

2. Emergency Shutdown

A. Know how to shut down the auger in case of an emergency.

B. Disconnect and lockout the power source.

C. Close bin well control gates.

D. Clear out as much grain from the auger and hopper as you can.

E. Reconnect and unlock the power source.

F. Gradually clear the auger until there is no grain or obstructions.

3. Lockout

A. Always stop and disconnect the power source whenever the operator must leave the work area or for

maintenance of the machinery.

B. Make sure no one can operate the unload auger while the operator is not in the work area.

Use the type of main power disconnect switch that is capable of being locked

only in the off position.

3. Storage Preparation

A. Close all wells to discharge tube.

B. Be sure the unload tube is empty.

C. Make sure power source is disconnected and locked out.

D. Check to see that all fasteners are secure.