8" vertical assembly – Grain Systems Unload Augers PNEG-1057 User Manual
Page 16
8" Vertical Assembly
8
8" & 10" Commercial Vertical Bin Unloading Auger - PNEG 1057
3. Attaching Vertical Section to Bin (cont.)
D. Adjust stand (#40 on page 9) so it holds the weight of the vertical auger.
E. Attach the support brackets and halfbands to the top half of the vertical tube by inserting the 5/16" U-bolt (4)
through the support brackets (5) and halfbands (6) and fasten together using four 5/16" nylon locknuts.
F. Attach lower telescoping tube sections (3) to the ears on the support brackets (5) using two
3/8" x 3/4" bolts with locknuts.
G. Slide the upper telescoping tube sections (1) into the lower tube sections (3). Attach upper tubes to the bin wall.
H. Secure the upper telescoping tubes to the lower telescoping tubes by tightening the square head setscrew (2).
A. First, connect the head stub shaft (13) to the short flight (3) using two 7/16" x 2-3/4" (grade 5)
bolts with locknuts.
B. Connect the four-hole flange bearing with lock collar (4) and the head plate (28) together using four
7/16" x 1-1/4" bolts with locknuts.
C. Attach the head plate (28) to the tube flange using eight 5/16" x 1" bolts with flat washers,
lockwashers, and nuts.
D. Connect side plates (22) and (23) to head plate (28) using four 1/2" x 1" bolts with lockwashers
and nuts. Also, at the same time attach the top and bottom belt guard brackets (27) using the same bolts.
E. Spin a 3/4" nut on the threaded rods of each strap and rod assembly (24). Insert threaded rods through holes in
side plates (22) & (23) and add four more 3/4" nuts. Leave only finger tight until later.
F. Place rods (26) in strap and rod assemblies (24) and secure with top straps (25) using
3/8" x 1-1/2" bolts with two flat washers and one nut on each bolt.
4. Attaching Motor Mount to Horizontal Section
1
2
1
3
4
5
6
7