beautypg.com

Chapter 7: roof assembly – Grain Systems Tanks PNEG-4105 User Manual

Page 110

background image

Chapter 7: Roof Assembly

IMPORTANT: The ladder assembly (A or B or C or D) and the manway hole (I or J or K or L) locations

must be determined before the center collar is positioned. The relationship between the
center collar channel clip (E), long center collar channel (F) and the spice plate (G) will dic-
tate the orientation of the ladder assembly on top of the roof. The possible locations where
the ladder assembly can be oriented are shown.

Figure 7-26 Ladder assembly orientation

A

Ladder assembly location 1

G

Splice plate

B

Ladder assembly location 2

H

Center collar

C

Ladder assembly location 3

I

Manway hole location 1

D

Ladder assembly location 4

J

Manway hole location 2

E

Center collar channel clip

K

Manway hole location 3

F

Long center collar channel

L

Manway hole location 4

Refer to

Assembling the Center Collar

for center collar clip assembly. Also refer to

Assemble and Install

Center Collar Channels and Cap Plates, page 126

for long center collar channel and splice plate

assemblies.

110

Pneg-4105 105 Ft Diameter 40-Series Bin